ChangesForX11R71

Upload page content

You can upload content for the page named below. If you change the page name, you can also upload content for another page. If the page name is empty, we derive the page name from the file name.

File to load page content from
Page name
Comment
What is 1 + 5

Proposed Changes for X11R7.1

Following the X11R6.9/X11R7 release, we plan to have roll-up (katamari) releases of the modular tree at regular 6 month intervals. However, since there were several significant changes that have been held off until after the 6.9/7.0 release for various reasons, we plan a shorter release cycle for X11R7.1 of about 4 months. Before the X11R7 release is shipped, the release manager will post the X11R7.1 schedule. Adam Jackson proposed a 7.1 release plan shortly after the 7.0 release.

Below is a list of the features we expected to add to the X11R7.1 release. Unfortunately, many of them were not completed in time, so are now on the list for ChangesForX11R72.

Please add other proposed changes to the list above as you think of them.